#FA2341
![redbridge-office-relocation-featured-img](https://8667769.fs1.hubspotusercontent-na1.net/hub/8667769/hubfs/website%20build%202023/images/case%20study%20images/redbridge-office-relocation-featured-img.jpg?width=300&name=redbridge-office-relocation-featured-img.jpg)
Redbridge CCG
London Relocation
![redbridge-office-relocation-London-4-sq](https://8667769.fs1.hubspotusercontent-na1.net/hub/8667769/hubfs/website%20build%202023/images/case%20study%20images/redbridge-office-relocation-London-4-sq.jpg?width=300&name=redbridge-office-relocation-London-4-sq.jpg)
![redbridge-office-relocation-London-3-sq](https://8667769.fs1.hubspotusercontent-na1.net/hub/8667769/hubfs/website%20build%202023/images/case%20study%20images/redbridge-office-relocation-London-3-sq.jpg?width=300&name=redbridge-office-relocation-London-3-sq.jpg)
![IMG_2039-rotated-sq](https://8667769.fs1.hubspotusercontent-na1.net/hub/8667769/hubfs/website%20build%202023/images/case%20study%20images/IMG_2039-rotated-sq.jpg?width=300&name=IMG_2039-rotated-sq.jpg)
![IMG_2045-sq](https://8667769.fs1.hubspotusercontent-na1.net/hub/8667769/hubfs/website%20build%202023/images/case%20study%20images/IMG_2045-sq.jpg?width=300&name=IMG_2045-sq.jpg)
Project brief
To project manage the re-location of staff from Maritime House and Imperial Office Suites to North House, creating 72 new agile workspaces.
Key criteria included re-location and re-use of as much of the existing furniture as possible in the new premises, dovetailing seamlessly with new furniture specified, tested and agreed.
Got a project? Call us today
Key outcomes
- Increased user flexibility and satisfaction
- £16,071 saved in new furniture spend
- £8630 of furniture donated and re-used in the community
- Value of savings through goods donated and re-used £40,000
- 6.6 tonnes furniture landfill eliminated
- All furniture items supplied recyclable by JPA at end of life. All packaging recycled or recyclable